EquiCore / Hardware Nodes / MegaWatt Mining Cluster ($MWMC)
Mining & Clean Energy Pool Target ~28% APY Post-Deployment 1 Node = $20

MegaWatt Mining Cluster ($MWMC): 4.2 MW Hydroelectric Power Integration on TON

An industrial infrastructure blueprint directly linking community capital with an engineered 4.2 MW run-of-the-river hydroelectric generation facility. Delivering zero-carbon power at direct turbine rates for resilient, dual-arbitrage cryptographic validation and high-performance computing.

Phase 1 • Hydro Infrastructure Pooling Active

Genesis Hydro Round ($MWMC Cluster 01)

Capital is dedicated strictly toward containerized server modules and turbine direct-power line integration.

Activated

2 702 Nodes

Round Target

15,000 Nodes ($300k)

Pool Progress: 18.0% 12 298 Remaining
Stage 1: Pooling CURRENT

Accumulation of 15,000 node licenses ($300,000). Continuous +16 PTS/h Proof of Capacity farming.

Stage 2: Hydro Connection UPCOMING

Deployment of modular containerized computing units with direct turbine tie-in to the 4.2 MW hydro station.

Stage 3: Zero-Carbon Yield ROADMAP

Dual-arbitrage computing online. 30–50% commercial net yields routed to DEX Buyback & Burn on STON DEX & DeDust.

4.2 MW Clean Hydro Power Architecture

Electricity cost is the defining determinant of commercial computing sustainability. The MegaWatt Mining Cluster ($MWMC) addresses this by sourcing clean baseload energy from a planned 4.2 MW run-of-the-river hydroelectric power installation.

By avoiding commercial retail electricity tariffs and capturing power directly behind the generation meter, operational expenditures (OPEX) are compressed to industry-leading sub-grid baselines, offering complete immunity against fossil-fuel price inflation.

Dual-Arbitrage Compute & Real Yield Engine

$MWMC computing modules leverage a dynamic software-arbitrage scheduler. The cluster alternates between high-throughput cryptographic blockchain validation and intensive scientific parallel computing depending on real-time market margins.

30% to 50% DEX Buyback

Surplus operating revenues directly trigger smart-contract market buybacks on STON DEX and DeDust, continuously retiring tokens from circulating supply.

+16 PTS/h Pre-TGE Mining

Node holders farm Proof of Capacity around the clock, locking in a verifiable pro-rata allocation for the upcoming TON token generation event.

Hardware Allocation

$20 / 1 Node License
Target APY: ~28% Post-Deploy
PTS Farming Speed: +16 PTS / hour
Genesis Round: 15,000 Nodes ($300k)
Stacking Rule: Cumulative (No limits)
0% Split Option: From $41.66 / mo
Activate in @EquiCoreBot
Verified Inflow Segregation

65% of all funds are hardcoded into the closed hardware procurement pool. 35% powers the 15-level affiliate program with instant USDT withdrawals from $5.00.

Engineering Blueprint

Hydrogeneration & Datacenter Specification

Industrial compute facility tied directly to hydroelectric turbines for near-zero per-kWh operational costs.

Hydroelectric Plant

4.2 MW Run-of-River Hydro

Direct baseload power from turbines bypassing commercial grid tariffs.

Behind-the-Meter 4.2 MW Capacity
Modular Datacenter

ISO 40ft High-Cube Modules

All-weather containerized modules with positive air pressure and climate control.

IP65 Protection Modular Capacity
Compute Architecture

Hybrid Dual-Compute

High-efficiency cryptographic accelerators and industrial parallel blades.

Dual Compute High-Throughput
Energy Efficiency

Sub-1.05 Record PUE

Direct run-of-river heat exchange eliminating parasitic cooling power overhead.

Hydro Cooling PUE < 1.05
Network & Telemetry

Fiber + LEO Satellite Uplink

Continuous on-chain telemetry of power generation and node telemetry to TON.

Redundant Uplink Real-Time IoT
ESG Standards

100% Zero-Carbon ESG

Zero greenhouse emissions with run-of-the-river flow design without reservoirs.

Zero Emission ESG Compliant

Dynamic Scheduler

Dual Task Arbitration Matrix

Автоматическое переключение мощностей между валидацией децентрализованных сетей и коммерческими вычислениями в зависимости от текущей рыночной маржи.

Consensus

Валидация и майнинг

Максимизация доходности в моменты высокой прибыльности консенсуса основных блокчейн-сетей.

Validation Protocols
Proof of Capacity TON Validators SHA-256 Mining DePIN Settlement
Direct access to low-cost baseload hydro
Complete immunity from grid rate spikes
HPC Workload

Scientific & HPC Workloads

Capacity leasing for commercial scientific tasks when mining difficulty shifts.

Processing Workloads
Physics Simulation Climate Modeling Big Data Processing Batch Rendering
B2B compute lease settlement in USDT
24/7 sustained 100% capacity utilization
AI Scheduler

Dynamic Margin Scheduler

Automated software agent scanning pools and B2B contracts for instantaneous arbitrage.

Arbitration Parameters
Spot Margin Network Difficulty Compute Tariff Auto-Rotation
Sub-second cluster workload switching
Zero hardware idle time

Tokenomics Engine

Revenue Distribution Waterfall

100% of clean operating cashflow from hydro generation and compute is routed via smart contracts to buybacks, node yields, and fleet reserve.

Gross Clean Energy & Arbitrage Revenue 100% On-Chain Settled
40% Buyback & Burn 30% Node Holders Yield 20% Hydro & Turbine OPEX 10% Fleet Reserve
40% DEX Buyback

Алгоритмический Buyback & Burn

Постоянный рыночный выкуп и сжигание токенов на DEX STON.fi и DeDust из операционной выручки.

30% Real Yield

Выплаты Real Yield держателям нод

Прямое начисление прибыли держателям лицензий нод $MWMC в стейблкоинах на кошельки TON.

20% Hydro OPEX

Обслуживание гидроузла и сети

Технический регламент турбин, водные сервитуты, каналы связи и эксплуатация площадки.

10% Fleet Reserve

Амортизация и расширение парка

Фонд плановой модернизации чипов, закупки новых модульных контейнеров и агрегатов.